RENEWABLE IMPACTS LLC
  • Home
  • Cost of Cycling
  • Collaborative Network
    • Full Collaborative Network Membership
    • Associate Collaborative Network Membership
    • Balancing Authority Status
  • RI Library
  • About Us/Contact Us
  • Store
  • Store
  • >
  • CAISO 2013 ALL REPORTED POWER PLANTS
  • >
  • 130489 Los Esteros Critical Energy Center - CT2

130489 Los Esteros Critical Energy Center - CT2

SKU: 130489
$2,995.00
$2,995.00
Unavailable
per item
This Renewable Impacts eRECC report presents an analysis of the causality of the 2013 cycling activity (movement) of the Los Esteros Critical Energy Center - CT2 power plant. The causality of the movement of this power plant is driven by any of the twelve (12) defined CAISO "drivers" of plant movement. Summary and tabular data (monthly and annual) is presented along with details of the Renewable Impacts eRECC cycling causality methodology. See below for the table of contents of this report.
  • Facebook
  • Twitter
  • Pinterest
  • Google+
Not Available
Table of Contents
1. Executive Summary
2. eRECC Report:
Los Esteros Critical Energy Center - CT2
3. Cycling Causality Framework
4. About Renewable Impacts LLC
5. Appendix A
    Power Plants in the CAISO 2013 eRECC Report Series
To find out if your plant might be a candidate for reconnaissance level cost of cycling analysis contact:
James (Jim) Schetter, President, Renewable Impacts LLC @ 303-727-4828 or email at
renewableimpacts@aol.com.


Copyright © 2019 by Renewable Impacts LLC
All rights reserved.

  • Home
  • Cost of Cycling
  • Collaborative Network
    • Full Collaborative Network Membership
    • Associate Collaborative Network Membership
    • Balancing Authority Status
  • RI Library
  • About Us/Contact Us
  • Store